We are using the same profile and thickness. Why do we need another structural check?
Because the distance between supports has changed.
When evaluating solar mounting structures, we often compare material grade, section dimensions and steel thickness.
But another dimension deserves equal attention:
The unsupported span—the distance a member bridges between its supports.
A profile verified for one support spacing is not automatically suitable for a longer span.
Consider two illustrative purlin arrangements:
For this example, both have:
Only the span changes.
The increase from 2 metres to 3 metres is 50%.
But the increase in structural demand is much greater.
For this simplified beam model, maximum bending moment increases with the square of the span.
(3 ÷ 2)² = 2.25
The 3-metre span therefore experiences 2.25 times the bending moment of the 2-metre span under the same load per metre.
The profile has not become stronger.
The demand on it has increased.
For the same model, elastic bending deflection increases with the fourth power of the span.
(3 ÷ 2)⁴ ≈ 5.06
That means approximately 5 times the deflection, despite using the same steel section.
This comparison illustrates why support spacing matters. Actual solar purlins may have continuous spans, concentrated module loads, different restraints and other behaviour that requires a project-specific analysis.

Fewer supports may reduce component quantities and installation work.
But increasing their spacing can also increase:
Reducing supports is an engineering decision. The revised arrangement needs verification.
An engineer may address a longer span through:
The appropriate choice depends on strength, stability, deflection, connections and installation requirements.
Before comparing mounting-structure quotations, ask:
What support spacing was used in the structural calculations?
Then confirm that the installation drawings and actual site arrangement match that spacing.
A report prepared for a 2-metre span does not establish suitability for a 3-metre span.
Likewise, relocating supports during installation should trigger a review of the affected members and connections.
The profile specification and the support layout must be evaluated together.
Same profile. Same thickness. Longer span. Greater structural demand.
When evaluating a solar mounting structure, check both the steel section and the distance between its supports.
Have you encountered projects where support spacing changed after the structure was designed?
First published on LinkedIn. Join the discussion there.

Sign up to receive structure specifications.
By subscribing you agree to with our Privacy Policy and provide consent to receive updates from our company.
© 2026 VRM STRUCTURES INDIA PRIVATE LIMITED. All rights reserved.